Installation Week #4

 

HBA field is finally installed, last tile placed June 22 2011.
All the tools have been sent to the next installation site,
which starts a week from now at Kilpisjärvi, Finland.

All LBA meches have been placed, and 69 LBA antennas is erected.
The station is now moose proof, with a two meter high fence surrounding the area.

Team picture from the last day of HBA installation (June 22 2011)