Installation Week #3

Photo: Leif Helldner

73 tiles installed at the end of week 24 (15 June 2011)

73 tiles installed, 24 more to go next week
192 markers positioned for LBA antennas
47 LBA meshes placed and anchored
Four LBA antennas erected
The fence installation have started, 
and now two meter high fence poles is surrounding the area

This entry was posted in Uncategorized. Bookmark the permalink.